Pilot
Deliver quickly
the tool
that matters
Your first operational, usable version (MVP), clean, secure
and documented, from 3 weeks, ready for real users.
For you
or with you
Delegate to move fast, or build with us to build up your skills. The line is flexible: you move between the two depending on the project phase.
From 3 weeks
You want to delegate delivery of a first usable version to move fast.
Mode
A clean, secure, documented pilot project
- First operational, usable version (MVP), ready for real users.
- Live demo and complete documentation.
- Source code delivered continuously, no lock-in.
- CI/CD, security, sanitization, and automated tests.
- QA, senior reviews, and a roadmap for what's next.
Pilot,
from 3 weeks
A validated concept becomes a first operational, usable version,
ready for real users.
Industrialization starts on day one: CI/CD, automated tests,
security, documentation, and source code delivered continuously.
AI accelerates every step; our senior engineers make the calls and own them.
Done right, the Pilot becomes the foundation for production:
future evolutions start from a clean base, with no debt to catch up on.
-
01
Prepare and prioritize
We lay the foundations of the project:
- A controlled, deliberately broken-down scope
- Backlog prioritized on business value
- Project rhythm: daily stand-ups, steering committee as needed
Deliverable: execution plan and first sprint launched
-
02
Build fast, build clean
We deliver value with every iteration:
- Short sprints, AI-assisted, controlled by seniors
- Regular demos under real conditions
- Continuous adjustments based on your feedback
Deliverable: usable features at every iteration
-
03
Industrialize and secure
The professional foundation is built in, not bolted on at the end:
- CI/CD, staging, and automatic deployment
- Automated tests, QA, and senior reviews
- Security: sanitization, dependency analysis, OWASP tests
Deliverable: a clean, secure, scalable foundation
-
04
Deliver, demonstrate, hand over
You walk away with a tool, and control over it:
- Live demo and handover to real users
- Business and technical documentation
- Source code delivered and method transferred
Deliverable: a usable pilot and a roadmap for what's next
A pilot ready for the field
Pilot project
From 3 weeks
Source code
Delivered continuously
CI/CD, tests, security
From day 1
From concept to the field
The Pilot is the foundation for everything that follows. Done right, every future evolution starts from a sound base: your budget goes to value, not to cleaning up what came before.
Prototype without industrialization
What often happens
- Works in demo, not in production
- Technical debt from the start
- No tests, no security, no documentation
- Impossible to evolve with confidence
With the GDN Pilot
What you get
- Usable by real users
- CI/CD, tests, and security built in
- Documentation and source code delivered
- A foundation that speeds up every future evolution